Instructions
Begin typing address and select from the populated dropdown:
Lot(s)
Address
Property Address
  • No work of any kind may begin in a floodplain until a floodplain development permit is issued, except for emergency repairs or appliance replacement, when the permit application must be received within 48 hours of the start of work.
  • The permit may be revoked if any false statements are made in this application.
  • The Floodplain Administrator may require drawings or other documentation with this application.
  • If the permit is denied or revoked, all work must cease until a valid permit is issued.
  • A Floodplain Certificate of Approval must be issued prior to any construction approvals or certificates.
  • The permit shall expire if no work has commenced within 180 days of the date issued.
  • This permit will not be valid until all other required local, state, or federal permits have been obtained. A Floodplain Management Permit does not imply permission or exemption from the requirements of other adopted codes and standards.
By signing and submitting this application, the Applicant gives consent to the local Floodplain Administrator or their representative to make reasonable inspections prior to the issuance of a Certificate of Compliance. Inspections are scheduled in accordance with Chapter 19, Section 106.

THIS APPLICATION MUST BE COMPLETED IN ITS ENTIRETY. By signing and submitting this application, the Applicant certifies that all statements contained in the application, and in any additional documentation submitted by the Applicant, are true and accurate. Incomplete applications will be returned without further review.
Block
{[PNAME]}
Address 2
{[ADDR]}
{[CITY]}, {[STATE]} {[ZIP]}
609-967-7043
www.avalonboro.net
  • Contacts
  • Application Details
  • Attachments & Certification
Address
Phone #
Email
Agent/Contractor same as applicant?
Phone #
City, State ZIP
Address
Email
Applicant Information
Name
City, State ZIP
Address
Business Name (If applicable)
Property Owner Information
Email
Name
Name
Applicant same as owner?
Phone #
Business Name (If applicable)
Agent/Contractor Information
Business Name (If applicable)
City, State ZIP
NEW Swimming pool, spa, hot tub
Other
Grading
Non-Residential (Commercial)
Clearing of previously undeveloped parcel
Drilling
Mixed Use (ex. Residential and Non-residential)
Elevated
Cost of Improvement (a)
Manufactured home (NOT including Modular)
Watercourse alteration
Cumulative value improvements last 10 years and/or substantial damage repair last 5 years (b)
Relocation of Existing Structure
Swimming pool equipment installation
Accessory (detached garage, cabana, etc.)
Other Development Activities (if applicable)
Multi-family residential (3 or more dwelling units)
Floodproofed
Mining
Water or sewer systems (not related to new construction of a building)
Percent of Value Change (a + b/c)
Roadway or bridge construction
Type of Development Activity
Replacement mechanical equipment, fixtures, etc.
Alteration to Existing Structure
Excavation (not related to a structural development)
** Relocation or Replacement: An existing structure being moved into a flood hazard area shall be treated as new construction
Tank Installation
Type of Structure (check all that apply)
Other
Substantial Improvement
Temporary
(ex. Construction trailer, tent)
If the value of an improvement to a structure or building system equals or exceeds 49% of the market value of the structure before the addition or alteration, the entire structure must be treated as a substantially improved structure. The value of improvements is the sum of “a” and “b” below. This subsection must be completed for all improvements in existing buildings.

Substantial Improvement Evaluation – Applicant insert value in line (a) below only. Lines (b) and (c) to be completed by the Floodplain Administrator

Placement of fill material
New Structure
Residential (One- or Two-Family dwelling)
Work Description
Accessory structure (ex. Detached garage, shed, cabana)
Swimming Pool
Dredging
Market Value of the Building (c)
Addition to Existing Structure
Setting of Temporary Structure
Drainage improvement (including culvert work)
Replacement of Existing Structure
Demolition of Existing Structure
Type Full Name :
Sign With Hand
Certification
Applicant Signature
I certify that to the best of my knowledge the information contained in the application is true and accurate. I understand that a floodplain permit may be denied or revoked if it is determined that submitted information regarding the project described herein is untrue or inaccurate. I understand that if, during the course of the project, changing conditions or project needs cause a substantial change in cost or scope of the project described herein, that it is my responsibility to report and detail the changed conditions or scope of the project to the local Floodplain Administrator for review.
Attach the following (if applicable):
  • Substantial Improvement Evaluation must be supported by project cost documentation and approved market value evaluation. Attach supporting documentation.
  • For New Structures, Additions, and Temporary Structures except tents and canopies: A site plan to scale, foundation plan, and elevation drawings shall be submitted with the application.
Attachments