Plumbing Permit
Village of
Hillside
425 N. Hillside Avenue
Hillside, IL 60162
(708) 202-3434
www.hillside-il.org
Begin typing address and select from the populated dropdown
  • General Information
  • Description of Work
  • Requirements
  • Attachments + Signature
First Name
State *
Contractor Information
Property Address
Property Information
Owner Information
ZIP *
Property Index Number
Property ZIP
Business Name
City *
City
First Name *
Address *
State
Address
License #
Last Name *
Is Owner The Same As Contractor?
Last Name
Phone # *
ZIP
Value of Construction
Phone #
Does Owner Have an Email?
Email
Email
Description of Work
Fixture Specifications
Describe the Work
1. All plumbing to conform to the State of Illinois plumbing code, most current addition.
2. Construction hours restrictions 7AM - 7PM
Total Number of Fixtures
2. Rough: All trades are to be completed before requesting inspection including plumbing and electric, before any interior wall finish is applied and after the framing is completed.
3. Sewer and water services: inspection of sewer and water line installation is required while the trench is open, prior to backfill.
The General Contractor is responsible for all of their subcontractor's work and that the required inspection is made at the proper time. A notice of 24 Hours is required in all cases. Incomplete installations requiring reinspection will result in an additional fee. Continued construction without the the proper required inspection could result in the contractor having to remove an element or portion of certificate of occupancy for the structure could result. If there is a question or problem, contact the Village of Hillside Building and Zoning Department.
6. Final: No occupancy of the structure will be permitted until a final inspection has been made and (when required) certificate of occupancy has been issued.
5. Other inspections: required, depending on the type of construction.
4. Engineering/Public works department: inspections on all on-site and off-site improvements according to the approved engineering plans for all construction other than single family residence. Inspections include all below grade and grade improvements. A final inspection and approval of all engineering must be completed by the engineering or public works departments before a certificate of occupancy will be issued.
Required Inspections For Owner or Contractors
1. Drain tile: The entire drain tile installation must be complete into the sump pit for the inspection. No backfill may be started until approval of drain tile and dam proofing is given.
Type Full Name :
Sign With Hand
Letter Of Intent *
Specify below if you are attaching any of the following required documents
Plumbing Contractor License *
Plan Specifications *
Attachments
If Other
Applicant Signaturesss
Having submitted the plans and specifications, I, the undersigned, hereby apply to the Building Department of the Village of Hillside, Illinois for a permit to perform the above mentioned work. If this permit is granted, I will comply with all the ordinances relating to the permit and pay all fees required. All work covered by this permit is to commence within three months of date of issuance, to be completed within nine months from the date of issuance and subject to the required inspections. No error or omission in either the plans or application, whether said plans have been approved by the Building Inspector or not , shall permit or relieve the applicant from constructing the work in any other manner than that provided for in the ordinances of this Village relating thereto.
Click the “Select files…” button below to attach your file(s) to this application
Other
Signature