You can use our online GIS maps found here and toggle on the aerial image
Sketch must show contractor access through your driveway to protect public infrastructure from any damage; the Township Engineer may consider alternate locations for good cause shown, but this will require a Street / Right-of-Way Opening Permit
Deer protection is required for 2 years after planting
Attachments
Replacement plan with locations, caliper (1.5-inch minimum required), species
Upload Planting Plan / Sketch, and photographs of trees to be removed.
The plan uploaded must contain the following information:
Aerial map (e.g. Google map), survey, plan, sketch showing locations, sizes (DBH), species, number of trees to be removed.