Sales Use Tax (3 % of Contract Price)
Contract Price (50 % of Total Valuation)
Search by typing property address: *
Date Submitted
Neighborhood
Block
This application is intended for roofing projects that do not require structural changes. Please use the Building Permit Application with Plan Review if you plan on making structural changes to your roof.
Open Space Tax (0.25 % of Contract Price)
Property Information
Reference Number
Permit Fee
Roofing Permit
Application
Lot
Project Address
Valuation of project including labor cost and material:
Valuation of permit will be based on the stated value listed on application or by applying the "Miscellaneous Project Valuation Schedules", whichever is greater, per the "Valuation Data" charts, Trustee Bill #1 2016 Columbine Valley has adopted the 2015 International Building Code and the 2014 National Electric Code
2 Middlefield Road
Columbine Valley CO 80123
(303) 795-1434
www.columbinevalley.org
  • Project Information
  • Roofing Requirements
Type Full Name :
Sign With Hand
Owner Information
Address
Attachment
If yes, supply a stamped engineer letter and additional costs. If you require a plan review from the Town of Columbine Valley, please use the Building Permit Application with Plan Review application.
Contractor Name *
Door to door solicitation prohibited without a valid solicitors permit. *
ZIP *
Description of Project *
Enter subcontractor details in the grid below:
Contractor Information
Phone # *
2. HOA Approval (exterior changes) *
Total Due
State *
License Number
Advertising signage is prohibited in Columbine Valley. *
Disclaimer:
Note: This is an estimate of fees. Please verify with the Town of Columbine Valley before preparing your check.
Does the roof require structural changes? *
City, State, ZIP
Certification
Following documents are required to process the permit and must be attached with the application. Please note that your application will NOT be processed until you select 'Yes' for the two below options.
Do you acknowledge this statement? *
Email *
Fees
1. Signed contract with Homeowner *
City *
Total Project Valuation *
No on street parking without a permit between 3:00 am - 6:00 am. *
All and any exterior modifications on property requires HOA approval, The Town of Columbine Valley will not process permit without HOA approval.
Please note that your application will NOT be processed until you agree and select 'Yes' to all the terms and conditions below.
Applicant Signature *
Phone # *
Name
Project Information
Please note that failure to submit required documents may delay your application, this is the responsibility of the applicant. Select Yes/No.
Email *
I hereby certify that the information mentioned above is true to my knowledge.
1. Insulation - Insulation above roof decking shall be continuous R25. Insulation in an attic or closed cavity shall be R38.
4. Ice Barrier - Ice barrier shall be used in lieu of normal underlayment and extend from the lowest edge of all roof surfaces to a point at least 24 inches inside of the building envelope.
1. Mid - Roof Inspection - When no more than 50% of roof covering is installed.
When to call for inspections during your project :
2. Roof Ventilation - Enclosed attics and enclosed rafter spaces where a ceiling is directly applied to the underside of the rafter shall have cross ventilation. The minimum net free ventilating area shall be 1/150 square feet of the area of the vented space.
Town of Columbine Valley Roofing Requirements:
5. 115 MPH nominal wind speed.
2. Final Inspection - When your project is complete.
5. Inspection line - 303 - 795 - 1434.
3. A ladder is required on site for all inspections.
3. Drip Edge Metal - Drip edge shall be provided at eaves and gable ends of roofs. Drip edge shall extend a minimum of 0.25 inch below the roof sheathing and extend up the roof deck minimum 2 inches onto the roof decking.
4. Inspections must be scheduled by 3pm the following day (Monday - Friday) the day before the desired inspection date. If no inspections are available for your preferred date, the next available inspection date will be offered to you.