OFFICE PROCEDURES FOR PERMIT PROCESSING
Zoning approval is the initial requirement for establishing a new business,
constructing a building, or making changes to a property's physical nature,
such as adding sheds, driveways, or fences. Most activities involving
property use or alterations require zoning approval. Contact the Building
Department before starting a project to determine if zoning approval is
necessary. The Building Department is responsible for enforcing municipal
development regulations, which are designed to guide land use appropriately
and ensure the health, safety, and welfare of the people in the Borough of
Leonia.
To start the process, obtain an application for Zoning Permit from the
Building Department office or online at the borough website,
www.leonianj.gov
. Complete the application, attach all required documents, and pay the
application fee during normal business hours. Incomplete applications will
not be accepted. The Zoning Officer can provide information on the
Borough's development regulations.
The Property Survey submitted with the application must accurately show the
property's existing conditions. The survey must be completed by a licensed
surveyor in New Jersey, drawn to scale, and not distorted by copy or fax.
It should display all physical improvements on the property, such as
buildings, driveways, walkways, pools, decks, fences, patios, and sheds. An
inaccurate survey will deem the application incomplete, and zoning review
will not proceed until an accurate survey is submitted.
A Site Plan is required for any proposed changes to the property's physical
improvements. This plan should include all aspects of the project, like new
buildings, driveways, walkways, pools, decks, fences, patios, and sheds,
drawn to scale with setback dimensions from buildings to property lines.
For projects involving construction beyond an existing structure's
footprint or for establishing/modifying non-residential use, submit
proposed floor plans and building elevations. Additionally, provide a
narrative describing the business activity, manufacturer's product
literature for items to be installed or built, or photos of existing site
conditions if necessary to understand the proposal.
A foundation location survey and final as-built survey may be required to
verify site conditions and to issue final approvals.
All information requested on the Zoning Worksheet must be submitted in order for the Zoning Permit Application to be deemed complete. lf an Applicant is unable to perform these calculations, the Applicant may need to obtain the assistance of an architect, engineer or surveyor.
The Maximum Building Coverage and Maximum Lot Coverage for each Zone District can be obtained from the Zoning Staff at the Building Department offices or in the Development Regulations section of the Town Code available on the Borough's website at www.leonianj.gov. Multiply these percentages times time lot area to determine the maximum coverage in square feet. The definitions of both Building Coverage and Lot Coverage are contained in the Leonia Borough Code.
Maximum permissible building coverage is 25%
Maximum permissible lot coverage is 25%
Maximum permissible totol combined coverage is 50%
Ordinance # 2020-6 Lot Coverage Exception
Lots 6000 square feet in area or less and have a detached garoge in the rear yard,
only 50% of the driveway located behind the front building facade of the dwelling
shall be counted as lot coverage.