Building Permit
425 N. Hillside Avenue
Hillside, IL 60162
(708) 202-3434
www.hillside-il.org
Village of
Hillside
Begin typing address and select from the populated dropdown *
  • General Information
  • Description of Work
  • Requirements
  • Attachments + Signature
ZIP
First Name *
Property Zip Code
Last Name
Last Name *
Construction Type *
City
Owner Information
Phone #
Email
Address *
Property Index #
Property Information
Does Owner Have an Email?
First Name
Type Of Contractor
License #
Is Owner The Same As Contractor? *
State *
Value of Construction *
Address
ZIP *
State
Contractor Information
Additional Contractors
Business Name
City *
Phone # *
Email
Property Address
Length (ft)
Construction Details
Decks
Description Of Construction
Width (ft)
Garage
Pool
If Other
Description Of Construction
Concrete Driveway Walk
New Building (cubic ft)
Other
Shed
Overall Height Above Grade (ft)
Asphalt Driveway
6. Sewer and water services: inspection of sewer and water lie installation is required while the trench is open, prior to backfill.
3. Foundation wall: after all forms and appurtenances are in place and braced, prior to concrete pour.
Required Inspections For Owner or Contractors
The General Contractor is responsible for all of their subcontractor's work and that the required inspection is made at the proper time. A notice of 24 Hours is required in all cases. Incomplete installations requiring reinspection will result in an additional fee. Continued construction without the the proper required inspection could result in the contractor having to remove an element or portion of certificate of occupancy for the structure could result. If there is a question or problem, contact the Village of Hillside Building and Zoning Department.
4. Drain tile: the entire drain tile installation must be complete into the sump pit for the inspection. No backfill may be started until approval of drain tile and dam proofing is given.
1. Footing: Bearing soil inspection, after footing excavation and form work with installation of all appurtenances if applicable (reinforcement bar, etc.), prior to concrete pour.
9. Final: No occupancy of the structure will be permitted until a final inspection has been made and (when required) certificate of occupancy has been issued.
2. Floor/Driveway slab: after underground electrical, plumbing, vapor barrier, wire mesh etc. are installed and gravel compacted, prior to concrete pour.
8. Other Inspections: required, depending on the type of construction.
5. Rough: all trades are to be completed before requesting inspection including plumbing and electric, before any interior wall finish is applied and after the framing is completed.
7. Engineering/Public works departments: inspection on-site and off-site improvements according to the approved engineering plans for all construction other than single family residence. Inspection include all below grade and grade improvements. A final inspection and approval of all engineering must be completed by the engineering or public works departments before a certificate of occupancy will be issued.
Type Full Name :
Sign With Hand
Applicant Signature
Attachments
Site Plan *
Having submitted the plans and specifications, I, the undersigned, hereby apply to the Building Department of the Village of Hillside, Illinois for a permit to perform the above mentioned work. If this permit is granted, I will comply with all the ordinances relating to the permit and pay all fees required. All work covered by this permit is to commence within three months of date of issuance, to be completed within nine months from the date of issuance and subject to the required inspections. No error or omission in either the plans or application, whether said plans have been approved by the Building Inspector or not , shall permit or relieve the applicant from constructing the work in any other manner than that provided for in the ordinances of this Village relating thereto.
Certificate Of Insurance *
Click the “Select files…” button below to attach your file(s) to this application
Specify below if you are attaching any of the following required documents
Plat Of Survey *
$10,000 License Permit Bond *
If 'Other', explain below
Other
Contractors License *
Plans & Specifications *
Signature