Use Group
{[PNAME]}
  • A double permit fee will be charged for work done without a permit.
  • Once all required application forms and supporting documents are received, all information will be forwarded to the TRC (State Agencies, Police, Fire, Utilities, etc) for review. Review timeframe for the TRC is up to 15 days.
  • All inspections must be scheduled through the office M-F 8am through 3pm.
  • Inspection requests can be emailed to planningadmin@hollyridgenc.org one day prior to the requested inspection date – please provide the permit number, address, and inspection requested.
  • All rough in trade inspections must be completed before framing rough in inspection.
  • All trade final inspections must be completed before Building Final Inspection.
  • Do not call inspectors directly to schedule inspections.
  • Effective April 2018, Foundation Survey is required before any construction after footer/foundation.
  • A Foundation Survey will be required prior to slab inspection.
  • Effective April 2018, a Final As-Built Survey is required before the Town will issue a CO.
  • A Final As-Built Survey for Manufactured Homes is required before the Tie-Down Inspection.
Town of Holly Ridge
{[ADDR]}
{[CITY]}, {[STATE]} {[ZIP]}
{[APHONE]}
www.hollyridgenc.org
Instructions
Specify the project address
  • Project Details
  • Building Details
  • Contacts Details
  • Technical Sections/Contractor Information
  • Zoning
  • Attachments
  • Certification
Permit Modification/Contractor Change
Project Information
# of Bedrooms
Total Heated Sqft
Is it located in a flood hazard area?
Water
Total Building Height
Description of Work
ZIP
# of Bathrooms
Sewer
Total Cost of Construction
Total Sqft
Address
Area of New Building (Sqft)
# of Stories
City
Garage Storage Sqft
Unit #
Total Unheated Sqft
# of Fuel Fixtures
Building Area Details
# of Plumbing Fixtures
State
Total Building Area Sqft
Type of Use
Standpipes Class
Change of Use
I-A
I-B
Occupancy/Use Details
Sprinklers Type
Incidential Uses
Are there standpipes?
Special Provisions
IV
Mixed Use Exception
V-A
Proposed Occupancy(s)
Primary Occupancy Classification
Accessory Occupancy Classification(s)
II-A
NC Building Code
III-A
2018 NC Building Code:
Mixed Use Separation
Is it a mixed occupancy?
Standpipes Type
Special Uses
Are special inspections required?
III-B
II-B
New Building
Basic Building Data
Are there sprinklers?
Construction Type
Current Occupancy(s)
Addition/Renovation
(check all that apply)
V-B
Email
Are you the Point of Contact?
Name
Phone #
Phone #
City
Name
Address
City
State
Same as Owner?
State
Email
Address
Name
Applicant Information
Property Owner Information
Email
ZIP
ZIP
Phone #
Technical Sections
Add technical sections for all applicable subcodes
ETJ
Intended Use
Wind Zone
CAMA Required
Side Corner Setback
Rear Setback
Front Setback
Side Setback
Zoning District
Zoning
Land Disturbance
Attachments

 ITEMS REQUIRED TO OBTAIN BUILDING PERMIT

- Building Permit application form, signed by Owner and All Contractors (unless contractor submits signed & notarized letter, noting state license number, authorizing owner/general contractor to pull permits on their behalf)
- Completed Zoning Permit application form
- Completed Temporary Power application form
- Completed General Contractor Workers’ Comp form
- Lien Agent Agreement
- Cost of Construction
- Construction Authorization from Onslow County, if applicable
- Intent to provide sewer service paperwork from ONWASA, if applicable
- Well Permit from Onslow County for new well, if applicable
- Bacteriological test for potability for existing well, if applicable
- Site Plan
- Construction Plans
- Floodplain Development Permit application, if applicable
- Building Code Summary completed for all Commercial Projects

 ALL INSPECTIONS must be scheduled through the office M-F 8am through 3pm

Inspection requests can be emailed to planningadmin@hollyridgenc.org one day prior to requested inspection date – please provide permit number, address, and inspection requested

- All rough in trade inspections must be completed before framing rough in inspection
- All trade final inspections must be completed before Building Final Inspection
- Do not call inspectors directly to schedule inspections
- Effective April 2018, Foundation Survey will be required before any construction after footer/foundation
- Effective April 2018, Final As-Built Survey required before Town will issue CO
- Final As-Built Survey for Manufactured Homes required before Tie-Down Inspection

Type Full Name :
Sign With Hand
Type Full Name :
Sign With Hand
A.
B.
Gas
Sign
Electrical
Signature
Certification
C.3.
II. AGENT SECTION (to be completed if the applicant is not the owner in fee)

I hereby certify the following: the proposed work is authorized by the owner in fee; and I have been authorized by the owner in fee to make this application as his agent.

I further certify the following: All required State, county, and local prior approvals have been given, including such certification as the construction official may require.

I agree to advise all contractors on this project that they are required to be registered and to comply with all North Carolina tax laws.

I understand that if any of the above statements are willfully false, I am subject to punishment.

Are you the contractor?
I agree to advise all contractors on this project that they are required to be registered and to comply with all North Carolina tax laws.
D.
C.
I further certify the following:

I personally prepared the plans submitted for: 1) the new home referred to in A.; or, 2) an addition, alteration, renovation, or repair to an existing single family residence owned and occupied by myself and located on the property listed on Tab 1; or, 3) a new structure that will be physically separate from, but that will be deemed part of, an existing single family residence that is owned and occupied by myself and located on the property listed on Tab 1.

I further certify that I will perform or supervise the following work:
C.2.
I further certify the following : All required State, county, and local prior approvals have been given, including such certification as the construction official may require.

I understand that if any of the above statements are willfully false, I am subject to punishment.

C.1.
I UNDERSTAND THAT IN MARKING BOX A, I ACKNOWLEDGE THAT I AM ASSUMING RESPONSIBILITY FOR THE WORK DONE ON SAID PROPERTY, THE CONDITION OF THE PROPERTY PRIOR TO, DURING, AND AFTER ANY WORK PERFORMED, AND FOR THE PERFORMANCE OF THE SUBCONTRACTORS I HIRE, EMPLOY, OR OTHERWISE CONTRACT OR WITH WHOM I MAKE AGREEMENTS TO PERFORM WORK. I AM VOLUNTARILY AND KNOWINGLY ASSUMING THIS RESPONSIBILITY.
Signature
C.5.
C.6.
I further certify that a new home (private residence) will be constructed on this property for my own use and occupancy. This dwelling is to be occupied by myself and is not to be used for any purpose other than single family residential use. I attest that all construction, plumbing, or electrical work will be done, in whole or in part, by me or by subcontractors under my supervision, in accordance with all applicable laws.
Plumbing
C.4.
Mechanical
Building

CERTIFICATION IN LIEU OF OATH

I. OWNER SECTION (to be completed if the applicant is the owner in fee)

I hereby certify that I am the owner in fee of the property listed on Tab 2.

Mark the following applicable boxes:

Demolition
Subtotals
The costs of work below are summarized from the information provided in this application.
Permit Subtotal
Total Cost of Work
Certificate Fee
Admin Fee
Electrical
Building
Plumbing
Sign
Estimated Fees
Mechanical
Subcode
New Building
Cost of Work Summary
The fees below are estimated based on the information provided in this application and are subject to change upon review.
Total