Mechanical
Other Permits' Service Change Fee
Power Pole
Plumbing
Expiration Date
Travel Trailer
Fee Assessed
Mechanical
Ready to go to Zoning?
Reconnect Fee
Permit Issuance Fee
Service Change Fee
Gas
Mobile Home
Fee Assessed
Calculated Fee
Primary Permit Fee Schedule
Demolition
2915 Canty Street, Suite Q
Pascagoula, MS 39567
(228) 769-3056
www.co.jackson.ms.us
ZIP *
Travel Trailer
Plumbing Sq Ft Fee
Admin - Construction Permit
Swimming Pool
Public Records Filing Fee
Mobile Home
Additional Fees
Please Note: Before entering Other Permits details you must fill out Flood Zone and Property Type.
For easier form navigation, press the Up Arrow to go back to the top of the screen.
Permit Expire Date
Electrical
Plumbing
Fireworks
Jackson County
Right of Way
City *
Permit Issue Date
Electrical
State *
Service Change?
Sq Ft Calculated Fee
Other Permits' Fee Total
Fee to Assess?
Additional Fees
Building
Overall Status
Building Decision
Structure Move
Demolition
Other Permits' Fee Schedule
Sq Ft Calculated Fee
Building Renewal Fees
Gas
Fee Assessed
Zoning Decision
Development / Land Disturbance
Construction Permit
Application
Specify the work site location. Search using one of the options below and select from the dropdown to confirm.
Fireworks
Calculated Fee
Development / Land Disturbance
Reconnect Fee
Other Permits' Permit Issuance Fee
Please Note: Enter the required information in the tabs. Press the Arrow to go back to the top of the screen.
When finished, press Submit in the Certification Tab.
Application Date
Parcel # *
Address *
Service Change Fee
Plan/Permit #
Type
Other Permits' Reconnect Fee
All Inspections Complete?
Power Pole
Building
Issue Date
Primary Permit Status
Building Renewal Fees
Right of Way
Structure Move
Swimming Pool
Fee to Assess?
Reconnect?
Other Permits' Public Records Filing Fee
Flood Decision
Property Details
New TRVT Fee
  • Property
  • Floodplain
  • Contacts
  • Primary Permit
  • Other Permits
  • Residential Req
  • Commercial Req
  • Mobile Home Req
  • Important
  • Attachments
  • Certification
Total (Square Footage)
Existing Use of Property
City
Intended Use
Height (Rooftop)
Width (Feet)
Type *
Area of Lot (Square Footage)
Building Size
Foundation
Interior Wall
Property Details
Living Area (Square Footage)
Exterior Wall
Roof
Other (Square Footage)
Building Materials
Length (Feet)
Zoning Info (TS)
Floodway
Suffix
Flood Zone
Panel #
Water
Zoning District
Floodplain Details
Floodplain Approval
Date of Panel
Sewer
Section (SEC)
RG
Census District
Base Flood Elevation
Firm #
Address
License #
Last Name
Property Owner Details
Last Name
First Name
Address
City *
Contractor Details
State *
Phone #
Is the Contractor same as Owner? If Yes, Owner information will populate after pressing "Submit" in the Certification Tab. *
ZIP *
City
EIN
Email
State
Email
Expiration Date
Type
Phone # *
ZIP
Company Name
First Name
Fireworks
Heating & Cooling
If Other
Tons
In-State Applicant?
Gas
Primary Permit Details
Valuation of Work
Type *
Mechanical
Quantity
Units
Permit Pick-up Location *
Class of Work *
Outlets
Other Permits

1. Completed Residential Building Permit Form.

2. Legal Description of the Property (Proof of ownership by way of a Warranty Deed or Deed of Trust) with parcel number.

3. An approved site evaluation report (see General Notes) or a letter from a local utility company indicating availability of water and sewer.

4. Certification letter from the Jackson County Utility Authority indicating sewer and/or water system(s) complies with its requirements for respective system(s).

5. If in a Special Flood Hazard Area: An Elevation Certificate, prepared by a Registered Professional Engineer or Land Surveyor, must be on file in our office prior to the start of any construction if the building location is in Flood Zone A or V. *Three Elevation Certificates will be required – (1) Construction Drawings, (2) Building Under Construction and (3) Finished Construction.

6. If in a Special Flood Hazard Area: A V-Zone and Breakaway Design Certificate, prepared by a Registered Professional Engineer or Land Surveyor, must be on file in our office prior to the start of any construction. (For Flood Zone “V”)

7. Site Plan (Legal Survey indicating property and setback lines, building footprint and distance from property lines, septic tank and drain field location, water well location, driveway, culverts and other site features)

8. The construction documents shall reflect the 2015 International Residential Code and be prepared by a Registered Design Professional (section 106.1). Specifications and Scaled Drawings (submit 2 sets) – Minimum 1/4” scale, all drawings must be of the same scale.

a. Foundation Plan and Details
B. Floor Plan(s).
C. Exterior Elevations.
D. Typical Wall Section(s).
E. Framing Details may be required.
F. Power, Lighting and Panel Board Schedule.
G. Heat, Ventilation and Air Conditioning Plan.
H. Plumbing Plan.

9. Storm water Drainage Plan.

10. Construction Site Runoff Controls Checklist (Completed and Signed).

11. Self-Contractor Letter signed by the property owner (when applicable).

Residential Requirements

1. Completed Commercial Building Permit Form.

2. Legal Description of the Property (Proof of ownership by way of a Warranty Deed or Deed of Trust) with parcel number.

3. An approved site evaluation report (see General Notes) or a letter from a local utility company indicating availability of water and sewer.

4. Certification letter from the Jackson County Utility Authority indicating sewer and/or water system(s) complies with its requirements for respective systems(s). (See attached JCUA Application to be completed and submitted to Jackson County Utility Authority.)

5. If in a Special Flood Hazard Area: An Elevation Certificate, prepared by a Registered Professional Engineer or Land Surveyor, must be on file in our office prior to the start of any construction if the building location is in a Flood Zone A or V. *Three Elevation Certificates will be required – (1) Construction Drawings, (2) Building Under Construction and (3) Finished Construction.

6. If in a Special Flood Hazard Area: A V-Zone and Breakaway Design Certificate, prepared by a Registered Professional Engineer or Land Surveyor, must be on file in our office prior to the start of any construction. (For Flood Zone “V”)

7. Site Plan (Legal Survey indicating property and setback lines, building footprint and distance from property lines, septic tank and drain field location, water well location, driveway, culverts and other site features)

8. The construction documents shall reflect the 2015 International Building Code and be prepared by a Registered Design Professional (section 106.1). Specifications and Scaled Drawings (submit 2 sets) - Minimum 1/4” scale, all drawings must be of the same scale.

a. Complete detailed specification
b. Site Plan (details listed in #7 above)
c. Grading and Site Stormwater Drainage Plan
d. Site Utility Plan
e. Foundation Plans and Details
f. Framing Plan(s) and Details
g. Floor Plan(s)
h. Reflected Ceiling Plan(s)
i. Roof Plan
j. Room Finish, Door and Window Schedules
k. Exterior and Interior Elevations
l. Wall Sections and Details
m. Building Sections
n. Power and Lighting Plans and Schedules
o. H.V.A.C. Plan and Schedules
p. Plumbing Plan and Schedules
q. Fire and Smoke Rated Partition Plan

9. Construction Site Runoff Controls Checklist (Completed and Signed).

Commercial Requirements

1. Completed Mobile Home Placement Application Form

2. Legal Description of the Property (Proof of ownership by way of a Warranty Deed or Deed of Trust) with parcel number.

3. An approved site evaluation report (see General Notes) or a letter from a local utility company indicating availability of water and sewer.

4. Certification letter from the Jackson County Utility Authority indicating sewer and/or water system(s) complies with its requirements for respective system(s).

5. If in a Special Flood Hazard Area: An Elevation Certificate, prepared by a Registered Professional Engineer or Land Surveyor, must be on file in our office prior to the start of any construction if the building location is in a Flood Zone A or V. *Three Elevation Certificates will be required – (1) Construction Drawings, (2) Building Under Construction and (3) Finished Construction.

6. If in a Special Flood Hazard Area: A V-Zone and Breakaway Design Certificate, prepared by a Registered Professional Engineer or Land Surveyor, must be on file in our office prior to the start of any construction. (For Flood Zone “V”)

7. Site Plan (Legal Survey indicating property and setback lines, building footprint and distance from property lines, septic tank and drain field location, water well location, driveway, culverts and other site features)

8. Mobile Home Registration Certificate (Obtain from County Tax Collector’s Office)

9. Signed lease/purchase agreement or a Notarized letter of permission if the applicant is not the property owner.

10. Documentation (Data Plate) of Zone II and/or Zone III mobile home is required prior to placement. (See attached example of a Data Plate.)

Mobile Home Requirements
3. Foundation
5. Construction site will have adequate dumpster for construction debris, to be placed once foundation has been completed and prior to framing.
Inspections (Must be prepared 48 hours on advance) Call (228) 769-3056
NO SPECIFIC TIME WILL BE GUARANTEED FOR INSPECTIONS. INSPECTIONS WILL BE PERFORMED AS SOON AS TIME AND ROUTING ALLOWS.
3. New on-site, wastewater systems (septic tanks) must meet the requirements of the State Department of Health. You have the option to contact the Jackson County Health Department at (228) 762-1173 or a Mississippi State Licensed Engineer of your choice to arrange for a site evaluation. Where existing wastewater systems have not been in continual use for the past six (6) months, on-site inspections are required to be performed by the State Department of Health or a Mississippi Licensed Engineer.
General Notes
2. Stack Vent (rough plumbing before pouring concrete)
1. Commencement of any work, prior to obtaining the required permits will result in doubling of all applicable permit fees.
5. Brick Tie
2. Work allowed by any permit must commence within six (6) months of the permit issuance date; the permit shall remain valid for twenty-four (24) months from date of issuance.
Depending on Permit Type the following inspections may be required: (No Inspections will be performed until all permits for the job are issued [Electrical, Plumbing, Mechanical and Gas])
1. Footing
6. The permit holder is responsible for ensuring that no erosion or escape of soil, sand, gravel or similar material from said parcel onto any public street or into any drainage channel or structure during or after construction. Failure to do so may cause your permit to be revoked. AN APPROVED CONSTRUCTION ENTRANCE WILL BE REQUIRED IN SUBDIVISIONS WITH OPEN DITCHES AND MAY BE REQUIRED ON OTHER CONSTRUCTION SITES. At anytime that the stormwater regulations are not in compliance, a stop work order may be issued and a re-inspection fee may be assessed.
4. Window Nailing
8. Temporary Non-Occupancy (30 Day Power)
4. Construction site will have adequate restroom (Porto-let) facilities on site at start of construction (site preparation).
THE APPROVED RED-LINED SET OF PRINTS SIGNED BY THE BUILDING OFFICIAL ARE REQUIRED ON-SITE FOR INSPECTIONS.
6. Framing (Includes: rough plumbing, electrical and mechanical)
9. Final (after completion of ALL work-including permanent erosion control)
7. Insulation Inspection
7. Issuance of permits and inspections by this office shall not relieve architects, engineers, contractors, subcontractors, or owners of their responsibilities relating to full compliance with the applicable, adopted codes of Jackson County.
Please attach all required documents below. *
Attachments
Type Full Name :
Sign With Hand
Construction Sequencing
Sediment Trap
Brush Barriers
Vehicle Washing and Maintenance
Chemical Stabilization
Grass Lined Channels
Silt Fence
Spill Prevention and Control Plans
Management Details
Check Dams
2. Is the land area greater than one (1) acre?
Soil Retention
Storm Drain Inlet Protection
Signature
Land Grading
This checklist shall accompany the Building Permit Application and is to be completed before construction begins for all developments which anticipate land disturbance during construction. The purpose of this checklist is to monitor compliance with the Jackson County Zoning Ordinance, Stormwater Regulations of the Environmental Protection Agency and the Stormwater Regulations of the Mississippi Department of Environmental Quality.
Sodding
Preservation of Natural Vegetation
Temporary Slope Drain
Permanent Seeding
Mulching
Vegetated Buffer
1. What is the land area disturbed (in acres) by the construction of this project?
4. Check below the best management practices that will be used in the completion of this project.
Wind and Sand Fences
Gradient Terraces
If you should need additional information concerning this, please contact Darrell Stringfellow at (228) 769-7458 or the Mississippi Department of Environmental Quality. Please sign below stating that you will comply with the Stormwater Regulations to the best of your ability.
Geotextiles
Construction Entrances
Sediment Filters/Textiles
Sediment Basins and Rock Dams
Permanent Diversions
Temporary Diversion Dikes
Site Waste Management
Soil Roughening
Filter Berms
3. If the land area is greater than one (1) acre, has compliance with the requirements of the Mississippi Department of Environmental Quality and the United States Environmental Protection Agency been attained?
Fireworks
Service Change Fee Total
Additional Fee Total
Right of Way
Houseboat
Total Refunded
Travel Trailer
Permit Fee Totals
Mechanical
Reconnect Fee Total
Calculated Fee
Balance Remaining
Building
Swimming Pool
Public Records Filing Fee Total
Sq Ft Calculated Fee
Power Pole
Permit Fee Total
Structure Move
Payment Log
Plumbing
Fee Assessed
Demolition
Additional Fees
Mobile Home
Reinspect Fee Total
Total Fee (Permit Fee Total + All Additional Fees)
Development / Land Disturbance
Electrical
Total Waived
Total Received
Gas
Permit Issuance Fee Total
Showers
Electrical - Commercial
One and One Half Bath
Fee
Lawn Sprinklers
Sinks
Fee
Other Fixtures
Motors (5.5 to 10hp)
Water Heaters
208/220 Circuits & Above
Sewer Lines
Motors (25 to 50hp)
New Meter Installations
Three Baths
Quantity
Sq Ft Valuation
Bathtubs
Quantity
Dishwashers
110/115 Circuits
Washing Machines
Fee Total
Water Lines or re-pipes
System
Electrical - Residential
Quantity
Motors (10.5 to 20hp)
Fee
Faucets
Disposals
Fee
Drains (Floor, roof, condensate, etc.)
Plumbing - Residential
Quantity
Two Baths
Water Closets
Water Coolers
Two and One Half Baths
One Bath
Fee Total
Amps
Plumbing - Commercial
Motors (Up to 5hp)
Building