1. Completed Commercial Building Permit Form.
2. Legal Description of the Property (Proof of ownership by way of a Warranty Deed or Deed of Trust) with parcel number.
3. An approved site evaluation report (see General Notes) or a letter from a local utility company indicating availability of water and sewer.
4. Certification letter from the Jackson County Utility Authority indicating sewer and/or water system(s) complies with its requirements for respective systems(s). (See attached JCUA Application to be completed and submitted to Jackson County Utility Authority.)
5. If in a Special Flood Hazard Area: An Elevation Certificate, prepared by a Registered Professional Engineer or Land Surveyor, must be on file in our office prior to the start of any construction if the building location is in a Flood Zone A or V. *Three Elevation Certificates will be required – (1) Construction Drawings, (2) Building Under Construction and (3) Finished Construction.
6. If in a Special Flood Hazard Area: A V-Zone and Breakaway Design Certificate, prepared by a Registered Professional Engineer or Land Surveyor, must be on file in our office prior to the start of any construction. (For Flood Zone “V”)
7. Site Plan (Legal Survey indicating property and setback lines, building footprint and distance from property lines, septic tank and drain field location, water well location, driveway, culverts and other site features)
8. The construction documents shall reflect the 2015 International Building Code and be prepared by a Registered Design Professional (section 106.1). Specifications and Scaled Drawings (submit 2 sets) - Minimum 1/4” scale, all drawings must be of the same scale.
a. Complete detailed specification
b. Site Plan (details listed in #7 above)
c. Grading and Site Stormwater Drainage Plan
d. Site Utility Plan
e. Foundation Plans and Details
f. Framing Plan(s) and Details
g. Floor Plan(s)
h. Reflected Ceiling Plan(s)
i. Roof Plan
j. Room Finish, Door and Window Schedules
k. Exterior and Interior Elevations
l. Wall Sections and Details
m. Building Sections
n. Power and Lighting Plans and Schedules
o. H.V.A.C. Plan and Schedules
p. Plumbing Plan and Schedules
q. Fire and Smoke Rated Partition Plan
9. Construction Site Runoff Controls Checklist (Completed and Signed).